Sunday, July 29, 2012

Main Tube Bonding

Main Tube Bonding
Edited, and compressed. Time was approximately 45 minutes from start to finish.

This does not include set up, and fabric cutting. Clock started with epoxy being mixed.

Did not go as well as hoped, but well enough. I could roll the fabric a little tighter. Lots of refinement possible.

Pressure low 20 psi for 5 minutes, then increased to 85 psi. I did not max it out.

Neat sample leftover was hard gelled about 2 hours after mixing. It was close to 90 in the shop today.

No comments:

Post a Comment